The contract officially signed by our Operations Manager Mr. Assad Al-Nour Suleiman Al-Alam and Mr. Basem A. Al-Shbily, Manager, Transmission Contracting Department at National Grid, Saudi Arabia
Surveillance System & Fire Fighting System between METS and Cominet B&C on 06/11/2024 at KISIA, Korea
has been awarded the prestigious Contract No. 44000021259,
Rerouting of Existing UG Cables in Makkah by the Saudi Electricity
Company for the relocation of 110KV XLPE cable circuits between
Makkah West BSP and Shamia-1 & Shamia-2 Substations.
The project involves design and Engineering Supplying,
and Installing new underground cable circuits along with civil works
including NMFOC marks a significant milestone for METS as we
continue to expand our footprint in the energy sector. The contract
officially signed by our esteemed CEO Mr.Won Koo Kwon and
Mr. ALFudaie F. AL- Qahtani, Manager, Transmission Contracting
Department at National Grid, Saudi Arabia.
METS has been awarded the prestigious Contract No. 4400020980,
Maintenance of Underground Cables in the Central Operating Area
(COA) by the Saudi Electricity Company for the Installation, Repair,
and Maintenance of underground Transmission and MV cables
(XLPE and LPOF) of voltages up to and including 380 kV, marks a
significant milestone for METS as we continue to expand our footprint
in the energy sector. The contract officially signed by our esteemed
CEO and Mr. Yahya M. Sharahili, Manager, Transmission Contracting
Department at Saudi Electricity Company.
visit to Our Head Office Today (23rd July 2024) to Finalize
Prequalification Process for all Maintenance Services up to 380kV.
Celebrating Continuous Success, METS rise to New Heights
REPLACING 110KV LPOF UNDERGROUND CABLE CIRCUITS (TPS10-AST3 & TPS11-AST5) IN THE WESTERN OPERATING AREA,
With a project value of SAR 53,093,315 (FIFTY THREE MILLION NINETY THREE THOUSAND THREE HUNDRED FIFTEEN).
It is a testament to our firm commitment to excellence and innovation in the power sector.
Thank you for your continued support and trust in METS.
REPLACEMENT OF 110KV LPOF UNDERGROUND CABLE CIRCUIT ZAHIR (04) – AL MANSOOR (06) IN WESTERN OPERATING AREA,
With a project value of SAR 34,484,644 (THIRTY FOUR MILLION FOUR HUNDRED EIGHTY FOUR THOUSAND SIX HUNDRED FORTY FOUR).
It is a testament to our firm commitment to excellence and innovation in the power sector.
Thank you for your continued support and trust in METS.
REPLACEMENT OF TWO EXISTING 110 KV LPOF UNDERGROUND CABLE TO XLPE FOR CIRCUIT TPS01
MSR06 & TPS04-MSR07 LOCATED IN TAIF, With a project value of SAR 32,459,706
(THIRTY TWO MILLION FOUR HUNDRED FIFTY NINE THOUSAND SEVEN HUNDRED SIX).
It is a testament to our firm commitment to excellence and innovation in the power sector.
Thank you for your continued support and trust in METS.
Underground Cables @ Northeast up to 380KV)
Awarded to METS on 26-May-2024 with contract Value
Amounting SAR 105,737,620.Contract signed by METS CEO
and Mr.Alfudaie F. Al-Qahtani, Manager, Transmission Contracting
Department
GIB, EHV Power Transformers & EHV Gantry Towers. 230 KV GIS:
Bay final inspection before shifting inside GIS Hall
EHV Power Transformers & EHV Gantry Towers. 230 KV GIS :
Shifting of the bays for final installation
EHV Power Transformers & EHV Gantry Towers. 230 KV GIS :
Shifting of LCC panels before final installation.
EHV Power Transformers & EHV Gantry Towers. 230 KV GIS :
METS team celebration for the achievement of first Bay installation
EHV Power Transformers & EHV Gantry Towers. 230 KV Gantry Tower :
Fixings and scaffolding for Stub Angle Templates.
EHV Power Transformers & EHV Gantry Towers. 230 KV GIS Room :
Bays installation & Fixing
EHV Power Transformers & EHV Gantry Towers. 230 KV GIS Room: Lifting &
Unloading GIS bays
Transformers & EHV Gantry Towers. LCC Panels shifting and arrangement
for final installation
of Underground Cables in Northeast upto 380kV, Amounting to SAR 105,737,620/-
and Hajer Substations to U/G Cables Dismantling
of 115kV Overhead Transmission line
for Power Transformers at Substations in TAIF) Awarded to METS
on 14-03-2024, With Contract Value of SAR 19,970,000.00. Contract Signed
by METS CEO and Mr. Yahya M. Sharahili, Manager, Transmission
Contracting Department, National Grid SA.
(XLPE 1200mm2) at Makkah West BSP, Shamia -1 & Shamia -2 Substations in Western Operating Area
(WOA) on January 1, 2024, Amounting to SAR 36,200,107
METS was recently awarded a fast-track contract from
Hyundai / Midong for the installation of 230 KV GIS Substation,
GIB, EHV Power Transformers and EHV Gantry Towers.
All 230KV cables, MV cables, and control cables for PKG-3 at Jafurah,
Aramco, KSA. The project involves the construction of two medium voltage
substations. It is anticipated that the entire project will be completed
within 10 months in 2024.
in the field of Testing & commissioning works with Hi-Pot test
up to 380kV cable,transformer and GIS, Protection and Tele-communication
systems for EHV/HVSubstations as an officially approved Testing and
Commissioning Company by the Saudi Electricity Company
- Centralized Services Department (SEC-CSD)
Cables from LV up to 380kv extended till 29-June-2024 with
Contract Amount SAR 11,885,270
.Company successfully in 115kv Underground Cable Transmission Line
Contract No.4400004094 Hameediya Abu Ganima & Hie ayun Line at
Al Hassa (EOA) and Actual P.A.C Date:20-Dec-2021 as approved by SEC.
Company successfully in 115kv Underground Cable Transmission Line
Contract No.4400004093 Masoudi-Andalus-Khalidiya Line at Al Hassa
(EOA) and Actual P.A.C Date:20-Dec-2021 as approved by SEC.
Company
successfully in 115kv Underground Cable Transmission Line Contract
No. 4400006299
Hajar Nuzha & Mahasen Line at Al Hassa (EOA) and Actual
P.A.C Date: 31st -May-2023 approved by SEC as EPC main Contractor.
Electricity Company successfully in 115kv Underground Cable
Transmission Line Contract No.4400004093 Masoudi-Andalus-Khalidiya
Line at Al Hassa (EOA) and energized the circuits on 16-Feb-2020.
SEC approved T.C.C for Masoudi Project.
Contract No# 4400004093 20/04/2020
NG Contract No# 4400004093 05/12/2020
30-06-2019,signatures of METS CEO And Vice President,Grid
Maintenance Business Unit upto 380 Kv System
Conversion of Hameediyah-Abu Ghanimah
HIE-Al-Uyun 115 KV
METS CEO on Nov 13 2018 for Con No # 4400006299
# 4400006299. Conversion of 115 KV OHTL between
Nuzha and Hajer Substation to U/G Cables.
khalidiya, NG Contract No# 4400004093 15/04/2020
in the field of Testing & commissioning works with Hi-Pot test
up to 380kV cable,transformer and GIS, Protection and Tele-communication
systems for EHV/HVSubstations as an officially approved Testing and
Commissioning Company by the Saudi Electricity Company
- Centralized Services Department (SEC-CSD)
Company successfully in 115kv Underground Cable Transmission Line
Contract No.4400004094 Hameediya Abu Ganima & Hie ayun Line at
Al Hassa (EOA) and energized the circuits on 21-May-2020.
SEC approved T.C.C for Hameediya Project.
Solution Provider for Power and Telecom Sector
We are committed to being a Company of the Highest Quality in every aspect of our Business Activities.
Design & Engineering
Supply and Installations
Testing & Commissioning
Highly Classified Tool & Equipment’s
We will integrate the best of contemporary practices with new technologies and resources to achieve growth, improvement and transformation.
Ongoing Projects
We will utilize the collaborative efforts and expertise of our workforce to coordinate diverse skills and to harmonize multiple streams of technology.
Our Prestigious Clients
FLASH NEWS
METS has been awarded by Saudi Electric Company (SEC):
Contract # 44000011804 to perform Maintenance and Repair of General Maintenance for Underground Cables System from Low voltage up to 380kv cable system includes all electrical jointing, Terminations and civil works in Grid Maintenance in Central Operating Area.;
Contract # 4400004093 for lump sum turnkey project as EPC Contractor for Conversion of “Masoudi -Andalus-Khalidiyah” 115kV Overhead Transmission Lines to Underground Cables in Eastern Region for the amount of 44 Million Saudi Riyals;
Contract # 4400004094 for lump sum turnkey project as EPC Contractor for Conversion of “Hameediyah -Abu Ghanimah” & “HIE-Al-Uvun” 115kV Overhead Transmission Lines to Underground Cables in Eastern Region for the amount of 45 Million Saudi Riyals;
Contract # 4400006299 for lump sum turnkey project as EPC Contractor for Conversion of 115kV Overhead Transmission Lines Between Nuzha And Hajer Substations to Underground Cables in Eastern Region for the amount of 42 Million Saudi Riyals;
We are pleased to inform you that, Saudi Electrical Company (SEC) issued TCC & FAC for Contract # 4400000623/00 for lump sum trunkey project as EPC Contractor for 110KV underground Cables transmission lines for 110 / 13.8 KV King Abdullah Sports SS project in Western Region for the amount of 68 Million Saudi Riyals was completed in 2016.
We have successfully completed in October 2017 – Electrical, Hipot & PD testing works for 14CKT no of 132kV Power Cables and 2 no of 132kV GIS at SEC-SOA 132kV Bareq & Mudalif SS projects in Jizan area.
We have successfully completed in November 2017 – Hipot & PD testing works for 380kV power cables circuit and this circuit length was 20kM along with AlFanar Co at SEC-COA 380kV Riyadh Metro–2 PP-07 Project at Riyadh.
We recently installed in November 2017 – 110kV Nexans GIS terminations 1200sqmm -6 nos, 110kV 1200sqmm Insulated Joints – 21 nos & and Link boxes – 07nos at SEC-WOA RFX # 4000053813 Installation Of 110 kV Underground Cables For110/13.8 KV Al Woaslia Substation Taif.
We recently installed in November 2017 – 115kV Nexans GIS terminations 400sqmm -9 nos, Outdoor terminations – 09nos at SEC-EOA RFX No-4000027602. Construction of Ain Murjan 115/13.8kV Substation project.
METS has specialized Testing Equipment “EHV Resonant Test System” with all required accessories, HI-POT Test for upto Ac 520KV HV/EHV, MV/LV Cables, GIS/GIB and Transformers.
We are well equipped with a Cable FAULT LOCATOR Model MeggerPFL40-2000. Specialized in FIBEROPTIC cable installation, Testing & Commissioning
We established a Civil Department from design engineering to complete Transmission Line civil work, having all kinds of civil equipments such as Excavator, Trailer, Dump Truck & Boom Truck etc.,
As METS believes strong IT backbone is the success of the company, hence implemented ERP System (ORACLE E-Business Suite) in 2011.
Start Your Free Consultation
A highly qualified site staff are sharing their utmost efforts for execution of awarded projects to ensure the finest, safe, work quality to the clients.