General Maintenance For Underground Cables System in Grid Maintenance, SEC Contract No# 4400011804 | Conversion of 115KV OHTL between HAJAR / NUZA to UG cables in AlHassa Area, SEC Contract # 4400006299. | SEC-EOA / HYUNDAI, ABU HADRIYADH PROJECT
Cable Laying work Pictures
Transformer Side Cable Termination pictures | SEC-COA / BEMCO CONTRACT # 10421119/00 – PP9 EXTENSION BLOCK-E PROJECT
380kV Cable Pulling work Pictures.
380kV Cable Jointing work Pictures.
380kV Cable Testing & Commissioning work Pictures. | SEC-EOA / NCC, ROYAL COMMISSION PROJECT IN 2008.
230kV Cable Pulling work Pictures.
230kV Cable Termination work Pictures. |
| | SEC- COA / BEMCO, PP9 E -BLOCK EXTENSION PROJECT PICTURES
132kV Cable Pulling work Pictures.
132kV Cable Jointing work Pictures.
132kV Cable Testing & Commissioning work Pictures. | SEC-WOA / NCC, RABIGH POWER PLANT EXTENSION STAGE -V AND STAGE-VII CONTRACT #20331004/00 IN 2008
Stage V.
Stage VII. | |
| | ROYAL COMMISSION CONTRACT # 071-C11 ELECTRICAL S/S STAGE 1 OF JUBAIL – 2
115kV Cable Pulling work Pictures.
115kV Cable Termination work Pictures. | SEC-COA / BEMCO CONTRACT # 10621166/00 – PP9 STAGE II (BLOCK-F) PROJECT, RIYADH IN 2008
380kV Cable Drum Loading and Unloading.
380kV Cable Pulling work Pictures.
380kV Cable Cleating Arrangement Pictures.
380kV Cable Jointing Pictures. | |
| | SEC NCC CONTRACT # 41033079/00 – KING FAHAD HOSPITAL S/S & JIZAN TOWN
Conversion of Overhead 132kV line in Underground Cable. | CABLE PULLING WORKS CONTRACT # GCCIA-8358- METS – HVDC BACK TO BACK CONVERTOR STATION AT AL-FADHILI IN 2008
380kV Cable Pulling work Pictures.
Site Inspection picture before starting Project. | |
| | SEC – COA CONTRACT # 10731066 / 00, AL WAROOD PROJECT IN RIYADH 2008
Trial Holes for Route Confirmation picture. | | |